Government of Saskatchewan ministries, Crown corporations and organizations are implementing contingency plans to minimize the impacts of postal service disruption.

Les ministères, sociétés d’État et organismes du gouvernement de la Saskatchewan mettent en œuvre des plans d’urgence (en anglais) visant à réduire les répercussions de l’interruption du service des postes.

Google Translate Disclaimer

A number of pages on the Government of Saskatchewan's website have been professionally translated in French. These translations are identified by a yellow box in the right or left rail that resembles the link below. The home page for French-language content on this site can be found at:

Renseignements en Français

Where an official translation is not available, Google™ Translate can be used. Google™ Translate is a free online language translation service that can translate text and web pages into different languages. Translations are made available to increase access to Government of Saskatchewan content for populations whose first language is not English.

Software-based translations do not approach the fluency of a native speaker or possess the skill of a professional translator. The translation should not be considered exact, and may include incorrect or offensive language. The Government of Saskatchewan does not warrant the accuracy, reliability or timeliness of any information translated by this system. Some files or items cannot be translated, including graphs, photos and other file formats such as portable document formats (PDFs).

Any person or entities that rely on information obtained from the system does so at his or her own risk. Government of Saskatchewan is not responsible for any damage or issues that may possibly result from using translated website content. If you have any questions about Google™ Translate, please visit: Google™ Translate FAQs.

2021 Highway Construction Season Wrap Up

Released on November 4, 2021

The 2021 highway construction season is wrapping up and highlighted by construction of new passing lanes and road improvements near provincial parks.

"Improving highway safety is vital for our government and we continue to make record investments into our transportation system," Highways Minister Fred Bradshaw said.  "With this year's projects, the province is on track to meet its Growth Plan target."

The Government of Saskatchewan has improved more than 1,000 km of provincial highways this year, the second of its 10-year Growth Plan goal to build and upgrade 10,000 km of highways. 

A key commitment for the 2021-22 construction season was the installation of new passing lanes on Highways 2, 3, 7, 14, 16 and 39 in Saskatchewan. While some passing lanes on Highway 16 will be open this winter, additional work will be required in the spring. Passing lanes provide more opportunities for drivers to pass safely and reduce collisions. 

Highway improvements made this construction season include:

  • 175 km of repaving; 
  • 635 km of pavement sealing and medium preservation treatments; and  
  • 240 km of Thin Membrane Surface and rural highway upgrades. 

This year's construction season also included completion of a bridge rehabilitation on Highway 1 east of Swift Current as well as 12 bridge and culvert replacements across the province including Highways 2, 5, 18, 26, 35 and 165. 

Government continues to invest in intersections and road safety.  As part of a five-year $100 million commitment to intersections and road safety, several projects were completed including: 

  • Intersection rumble strips at the junction of Highway 9 and Highway 22;
  • Intersection improvements on Highway 364 at Balgonie;
  • Intersection improvements at the junction of Highway 11 and North Grid Road north of Dundurn; and
  • Intersection sight triangle and right-of-way sightline improvements across the province. To date 60 per cent of all highway intersections in Saskatchewan have been addressed.

Two additional projects are expected to be completed this winter including lighting at the junction of Highway 9 and Highway 18, and a flashing warning light at the junction of Highway 55 and Highway 240.

While many projects have wrapped up, work continues year-round.  Drivers are reminded to observe posted speed limits in work zones and slow to 60 km/h when passing highway workers and equipment. 

The Government of Saskatchewan has invested more than $10.6 billion in highways infrastructure since 2008, improving more than 17,100 km of Saskatchewan highways.

-30-

For more information, contact:

Steve Shaheen
Highways
Saskatoon
Phone: 306-260-9159
Email: steve.shaheen@gov.sk.ca

We need your feedback to improve saskatchewan.ca. Help us improve