Government of Saskatchewan ministries, Crown corporations and organizations are implementing contingency plans to minimize the impacts of postal service disruption.

Les ministères, sociétés d’État et organismes du gouvernement de la Saskatchewan mettent en œuvre des plans d’urgence (en anglais) visant à réduire les répercussions de l’interruption du service des postes.

Google Translate Disclaimer

A number of pages on the Government of Saskatchewan's website have been professionally translated in French. These translations are identified by a yellow box in the right or left rail that resembles the link below. The home page for French-language content on this site can be found at:

Renseignements en Français

Where an official translation is not available, Google™ Translate can be used. Google™ Translate is a free online language translation service that can translate text and web pages into different languages. Translations are made available to increase access to Government of Saskatchewan content for populations whose first language is not English.

Software-based translations do not approach the fluency of a native speaker or possess the skill of a professional translator. The translation should not be considered exact, and may include incorrect or offensive language. The Government of Saskatchewan does not warrant the accuracy, reliability or timeliness of any information translated by this system. Some files or items cannot be translated, including graphs, photos and other file formats such as portable document formats (PDFs).

Any person or entities that rely on information obtained from the system does so at his or her own risk. Government of Saskatchewan is not responsible for any damage or issues that may possibly result from using translated website content. If you have any questions about Google™ Translate, please visit: Google™ Translate FAQs.

$17.8 Million Invested In Saskatchewan Health Facility Maintenance

Released on June 19, 2020

Health Minister Jim Reiter is announcing the investment of $17.8 million in 87 health facility maintenance and upgrade projects across Saskatchewan.

These projects are part of the Government of Saskatchewan’s $7.5 billion two-year capital to plan to build a strong Saskatchewan and stimulate Saskatchewan’s economic recovery.

Under the two-year, $2 billion capital booster shot to build a strong Saskatchewan, $200 million of additional funding was designated for health infrastructure, including $100 million for health facility maintenance funding.

“This increase in capital funding will help us upgrade existing health care facilities and improve the experiences of patients, residents and staff,” Reiter said.  “Our government recognizes the importance of maintaining and upgrading facilities and supporting safe health care environments.  By connecting this work to our province’s economic recovery, Saskatchewan residents will benefit from improved health care as well as an improved economy.”

The $17.8 million in additional maintenance funding in 2020-21 will finance 87 facility improvement projects, including roof replacements, renovations to clinic spaces, generator and boiler replacements, and security improvements, including:

  • Front entrance upgrades at Battlefords Union Hospital
  • Water and sewer line replacement at the Regina General Hospital
  • Replace roof on 1978 Building at Royal University Hospital, Saskatoon
  • Boiler replacement project at Melfort Hospital
  • Design for new ambulance bay at the La Ronge Health Centre
  • Generator replacement/upgrade project Kindersley Hospital and District Health Centre
  • Replace the cast iron pipes in the acute care wing of the Shaunavon Hospital and Care Centre

Of the $100 million in health renewal project funding announced as part of the plan to build a strong Saskatchewan, a total of $25 million will be provided in 2020-21, including the $17.8 million in health maintenance projects and $7.2 million in long-term care maintenance projects announced earlier this week.

The remaining $75 million is allocated for 2021-22 and is expected to allow a further 225 projects to be completed.

The funding being announced today will be in addition to the $55 million for health facility maintenance and upgrades already included in the 2020-21 Budget.

Local communities and industries will benefit directly from these projects, and will be included in planning and construction work.

-30-

For more information, contact:

Colleen Book
Health
Regina
Phone: 306-787-4083
Email: media@health.gov.sk.ca

We need your feedback to improve saskatchewan.ca. Help us improve