Government of Saskatchewan ministries, Crown corporations and organizations are implementing contingency plans to minimize the impacts of postal service disruption.

Les ministères, sociétés d’État et organismes du gouvernement de la Saskatchewan mettent en œuvre des plans d’urgence (en anglais) visant à réduire les répercussions de l’interruption du service des postes.

Google Translate Disclaimer

A number of pages on the Government of Saskatchewan's website have been professionally translated in French. These translations are identified by a yellow box in the right or left rail that resembles the link below. The home page for French-language content on this site can be found at:

Renseignements en Français

Where an official translation is not available, Google™ Translate can be used. Google™ Translate is a free online language translation service that can translate text and web pages into different languages. Translations are made available to increase access to Government of Saskatchewan content for populations whose first language is not English.

Software-based translations do not approach the fluency of a native speaker or possess the skill of a professional translator. The translation should not be considered exact, and may include incorrect or offensive language. The Government of Saskatchewan does not warrant the accuracy, reliability or timeliness of any information translated by this system. Some files or items cannot be translated, including graphs, photos and other file formats such as portable document formats (PDFs).

Any person or entities that rely on information obtained from the system does so at his or her own risk. Government of Saskatchewan is not responsible for any damage or issues that may possibly result from using translated website content. If you have any questions about Google™ Translate, please visit: Google™ Translate FAQs.

Winter Weights Taking Effect Soon

Released on November 15, 2019

Check the Hotline for Updates

Colder weather leads to benefits for the trucking industry as harder surfaces allow heavier loads to be shipped.

“As a land-locked province, the trucking industry plays a major role in getting our exports to market,” Highways and Infrastructure Minister Greg Ottenbreit said.  “Winter weight season allows shippers to haul heavier loads on secondary-highways, resulting in fewer trips and cost savings for the industry.”

Winter weights are put in place annually from about mid-November to mid-March.  Because the road bed freezes during this period, it is stronger and can withstand heavier truck loads without being damaged.  Typically, winter weights allow truckers to carry up to 15-20 per cent more payload on secondary highways than what can be carried during the summer.

Restrictions on the winter weights can be in effect from November 16 to 30 and also from March 1 to 14.  When temperatures rise and roadbeds remain soft, the ministry may remove winter weights in some areas.  Commercial truckers and shippers are encouraged to check the status regularly at www.saskatchewan.ca/truckingweights.

To find the latest road restriction orders online, visit www.saskatchewan.ca/highwayhotline, follow us on Twitter @SkGovHwyHotline and look for #skweights or call the Hotline at 511.

For technical and regulatory information, commercial carriers can contact the Inquiry Line weekdays from 8:30 a.m. to 4:30 p.m. at 1-866-933-5290 in Saskatchewan or 306-933-5290 outside the province.

-30-

For more information, contact:

David Horth
Highways and Infrastructure
Regina
Phone: 306-787-4804
Email: david.horth@gov.sk.ca
Cell: 639-590-5518

We need your feedback to improve saskatchewan.ca. Help us improve