Government of Saskatchewan ministries, Crown corporations and organizations are implementing contingency plans to minimize the impacts of postal service disruption.

Les ministères, sociétés d’État et organismes du gouvernement de la Saskatchewan mettent en œuvre des plans d’urgence (en anglais) visant à réduire les répercussions de l’interruption du service des postes.

Google Translate Disclaimer

A number of pages on the Government of Saskatchewan's website have been professionally translated in French. These translations are identified by a yellow box in the right or left rail that resembles the link below. The home page for French-language content on this site can be found at:

Renseignements en Français

Where an official translation is not available, Google™ Translate can be used. Google™ Translate is a free online language translation service that can translate text and web pages into different languages. Translations are made available to increase access to Government of Saskatchewan content for populations whose first language is not English.

Software-based translations do not approach the fluency of a native speaker or possess the skill of a professional translator. The translation should not be considered exact, and may include incorrect or offensive language. The Government of Saskatchewan does not warrant the accuracy, reliability or timeliness of any information translated by this system. Some files or items cannot be translated, including graphs, photos and other file formats such as portable document formats (PDFs).

Any person or entities that rely on information obtained from the system does so at his or her own risk. Government of Saskatchewan is not responsible for any damage or issues that may possibly result from using translated website content. If you have any questions about Google™ Translate, please visit: Google™ Translate FAQs.

Winter Weights To Be Removed

Released on March 14, 2019

Effective March 15 at 12:01 a.m., any existing winter weights are removed for the entire province and allowable weights return to normal regulation weights.

“Winter weights are permitted on secondary highways so shippers can carry more weight during the winter months,” Highways and Infrastructure Minister Lori Carr said.  “Our staff monitor road conditions carefully so the reversion to regulation weight occurs at the correct time, protecting our roads from damage during the spring melt.”

Winter weights typically run from about November to March.  Once the road bed freezes it can withstand heavier truck loads without being damaged
.
Spring Road Bans

Spring road restrictions are dependent on weather.  Spring road bans are a tool that the province and rural municipalities have used for decades to mitigate damage to infrastructure during the sensitive thawing period.  Typically, these road restrictions start in March in the southwest of the province, and the remainder over a two to three-week period.  The spring road bans reduce allowable weights on RM roads and secondary weight provincial highways by 10 to 15 per cent and usually last for about six weeks.

To check which highways are impacted by weight restrictions, please visit https://www.saskatchewan.ca/business/transportation-and-road-construction/information-for-truckers-and-commercial-trucking-companies/regulations-and-road-restrictions/increased-weights-and-road-restrictions.  Spring road bans will be posted as necessary under the "New Spring Order" link.

To view the interactive map showing winter weight restrictions and spring road bans, visit www.saskatchewan.ca/highwayhotline and scrolling down to restrictions.  Information is also available by contacting the Highway Hotline at 511.

-30-

For more information, contact:

Steve Shaheen
Highways and Infrastructure
Regina
Phone: 306-933-5641
Email: steve.shaheen@gov.sk.ca

We need your feedback to improve saskatchewan.ca. Help us improve