Government of Saskatchewan ministries, Crown corporations and organizations are implementing contingency plans to minimize the impacts of postal service disruption.

Les ministères, sociétés d’État et organismes du gouvernement de la Saskatchewan mettent en œuvre des plans d’urgence (en anglais) visant à réduire les répercussions de l’interruption du service des postes.

Google Translate Disclaimer

A number of pages on the Government of Saskatchewan's website have been professionally translated in French. These translations are identified by a yellow box in the right or left rail that resembles the link below. The home page for French-language content on this site can be found at:

Renseignements en Français

Where an official translation is not available, Google™ Translate can be used. Google™ Translate is a free online language translation service that can translate text and web pages into different languages. Translations are made available to increase access to Government of Saskatchewan content for populations whose first language is not English.

Software-based translations do not approach the fluency of a native speaker or possess the skill of a professional translator. The translation should not be considered exact, and may include incorrect or offensive language. The Government of Saskatchewan does not warrant the accuracy, reliability or timeliness of any information translated by this system. Some files or items cannot be translated, including graphs, photos and other file formats such as portable document formats (PDFs).

Any person or entities that rely on information obtained from the system does so at his or her own risk. Government of Saskatchewan is not responsible for any damage or issues that may possibly result from using translated website content. If you have any questions about Google™ Translate, please visit: Google™ Translate FAQs.

Weight Of Bridges Restricted For Public Safety

Released on April 5, 2019

Following the failure of a newly constructed bridge in the RM of Clayton last fall, the Saskatchewan Association of Rural Municipalities and the Ministry of Highways and Infrastructure partnered through the Municipal Roads for the Economy Program to commission an inspection and structural assessment of bridges known to have similar design and construction.

An engineering firm inspected six bridges located throughout Saskatchewan and preliminary findings recommend that five of the six bridges be weight restricted to carry less than secondary weights.  These weight restrictions affect a bridge in the RM of Caledonia, the RM of Mervin and the RM of Scott as well as two bridges in the RM of Perdue.

Some of these bridges impact heavy haul routes throughout the province, including one Alternate Truck Route and one Clearing the Path corridor.

To ensure public safety, the Ministry of Highways and Infrastructure is working with the rural municipalities to weight restrict or close the roadways containing these bridges until appropriate improvements or remedial work can be completed.

Results of the inspection and assessment will be forwarded to the Association of Professional Engineers and Geoscientists of Saskatchewan, which regulates professional engineering in the province.  In Saskatchewan, professional engineers must follow the Canadian Highway Bridge Design Code when designing a bridge.  This is no different than the requirement that homebuilders follow the Canadian Building Code when designing a building.

For more information on weight restrictions and road closures, visit the Highway Hotline at www.hotline.gov.sk.ca, follow us on Twitter and Facebook or call the Highway Hotline at 511.

-30-

For more information, contact:

Jill Sveinson
Highways and Infrastructure
Regina
Phone: 306-787-4804
Email: jill.sveinson@gov.sk.ca

We need your feedback to improve saskatchewan.ca. Help us improve