Government of Saskatchewan ministries, Crown corporations and organizations are implementing contingency plans to minimize the impacts of postal service disruption.

Les ministères, sociétés d’État et organismes du gouvernement de la Saskatchewan mettent en œuvre des plans d’urgence (en anglais) visant à réduire les répercussions de l’interruption du service des postes.

Google Translate Disclaimer

A number of pages on the Government of Saskatchewan's website have been professionally translated in French. These translations are identified by a yellow box in the right or left rail that resembles the link below. The home page for French-language content on this site can be found at:

Renseignements en Français

Where an official translation is not available, Google™ Translate can be used. Google™ Translate is a free online language translation service that can translate text and web pages into different languages. Translations are made available to increase access to Government of Saskatchewan content for populations whose first language is not English.

Software-based translations do not approach the fluency of a native speaker or possess the skill of a professional translator. The translation should not be considered exact, and may include incorrect or offensive language. The Government of Saskatchewan does not warrant the accuracy, reliability or timeliness of any information translated by this system. Some files or items cannot be translated, including graphs, photos and other file formats such as portable document formats (PDFs).

Any person or entities that rely on information obtained from the system does so at his or her own risk. Government of Saskatchewan is not responsible for any damage or issues that may possibly result from using translated website content. If you have any questions about Google™ Translate, please visit: Google™ Translate FAQs.

Four-Lane Traffic Set to Reopen on Highway 1 East of Regina

Released on October 20, 2016

Your drive home east of Regina will be smoother as the repaving of Highway 1 between Pilot Butte access and Balgonie is complete.  Four-lane traffic will be reopened Friday morning, following more than four months of major construction.

“We understand that people living in the Regina area have likely been delayed by Regina Bypass construction over the last number of months,” Highways and Infrastructure Minister David Marit said.  “We would like to thank everyone for their patience and understanding.  Work remains on time and on budget and about one year from now, new overpasses at Balgonie and White City will be open to traffic, providing a long-term improvement to safety issues on Highway 1 East.”

With the full opening of the highway, temporary traffic signals will remain at the intersection of Highway 1 and Highway 48 due to site line concerns and ongoing construction on the White City overpass.


Regina Bypass Design Builders (RBDB) will be increasing the speed on most areas of Highway 1 East to 80 km/hr, while 60km/hr zones will remain in effect at the overpass sites at White City and Balgonie.  Other ongoing work along the corridor will require reductions to one lane and 60 km/hr, as needed.  RBDB will continually monitor traffic flow throughout the winter.

“We have reached our planned milestone for the year on the rehabilitation works on Highway 1,” RBDB Project Director Alisdair Dickinson said.  “The significant co-operation, understanding and support we received from our stakeholders and the community were key to our construction success this year.”

Other traffic changes in the area east of Regina include:
  • Opening of the new north service road between the Pilot Butte access and Gravel Pit Road;
  • Opening of the new south service road between the Pilot Butte access and Gravel Pit Road;
  • Detour of traffic from the Pilot Butte access to Gravel Pit Road; and
  • Permanent closure of the intersection of the Pilot Butte access and Highway 1.
Major construction work will take place on the remaining six kilometres of the eastbound and westbound lanes from east of the Pilot Butte access to Tower Road next year.  The construction of the Regina Bypass includes:
  • 12 overpasses;
  • 40 kilometres of new four-lane highway;
  • 20 kilometres of resurfaced four-lane highway;
  • 55 kilometres of new service roads; and
  • Twinning of approximately five kilometres of Highway 6.
-30-

For more information, contact:

Doug Wakabayashi
Highways and Infrastructure
Regina
Phone: 306-787-6815
Email: doug.wakabayashi@gov.sk.ca
Cell: 306-536-0049

We need your feedback to improve saskatchewan.ca. Help us improve