Government of Saskatchewan ministries, Crown corporations and organizations are implementing contingency plans to minimize the impacts of postal service disruption.

Les ministères, sociétés d’État et organismes du gouvernement de la Saskatchewan mettent en œuvre des plans d’urgence (en anglais) visant à réduire les répercussions de l’interruption du service des postes.

Google Translate Disclaimer

A number of pages on the Government of Saskatchewan's website have been professionally translated in French. These translations are identified by a yellow box in the right or left rail that resembles the link below. The home page for French-language content on this site can be found at:

Renseignements en Français

Where an official translation is not available, Google™ Translate can be used. Google™ Translate is a free online language translation service that can translate text and web pages into different languages. Translations are made available to increase access to Government of Saskatchewan content for populations whose first language is not English.

Software-based translations do not approach the fluency of a native speaker or possess the skill of a professional translator. The translation should not be considered exact, and may include incorrect or offensive language. The Government of Saskatchewan does not warrant the accuracy, reliability or timeliness of any information translated by this system. Some files or items cannot be translated, including graphs, photos and other file formats such as portable document formats (PDFs).

Any person or entities that rely on information obtained from the system does so at his or her own risk. Government of Saskatchewan is not responsible for any damage or issues that may possibly result from using translated website content. If you have any questions about Google™ Translate, please visit: Google™ Translate FAQs.

Well Reclassification and Completion Application

Apply for authorization:

  • To reclassify a well in Saskatchewan when the product produced by the well or the role of the well changes.
  • To recomplete a well in Saskatchewan if a new well completion is added after the initial completion.
Top

1. Guidance

Regulations to reclassify or recomplete a well in Saskatchewan after a well is initially completed can be found in The Oil and Gas Conservation Regulations, 2012.

For more information see Guideline PNG024: Reclassification and Recompletion.

Also see the following Directives and Guidelines for additional regulatory requirements for your reclassification or recompletion authorization application:

Top

2. Eligibility

Applicants must:

Top

3. How To Apply

There are two methods for applying for a reclassification or recompletion authorization:

NOTE: If an application is to both reclassify and recomplete the well, either application type can be selected to submit the application.

  • If the reclassification or recompletion is required as part of a reservoir application, complete the following steps:
    1. Ensure the eligibility criteria are met.
    2. Depending on the reservoir application type, complete the requirements set out for:
      • Waterflood
      • Enhanced Oil Recovery (EOR)
      • Spacing Modification
      • Commingling
      • Storage Projects
    3. Complete and attach the Reclassification/Recompletion Form (part of reservoir) as part of the Reservoir Application.
    4. Include all applicable supporting documentation in accordance with the Guideline PNG024.
    5. Log in to IRIS and complete the appropriate application process and attach the required documents.

NOTE: If a reservoir application is submitted, the reclassification/recompletion detail is to be attached if required (if existing wells are to be reclassed or recompleted as part of that reservoir application) and a separate reclassification/recompletion form is not required.

The applicant will be notified through IRIS whether the application for authorization is approved or denied.

Top

4. Apply

Top

5. Further Information

  • The operator must report when they physically complete the recompletion or reclassification of the well.
  • Authorizations are valid 1 year from date of issue.
  • There can only be one pending status on a well. For example, if an authorization is provided for recompletion, and that action is not taken on the well, then at a later date an application is made to reclassify the well, the reclassification authorization will replace the existing recompletion approval.
  • For plugging back a completion where the intent is to abandon the well, see Well Abandonment.